News & Announcements.

News

April 4, 2025

Major SP203 upgrade from 2 Mediums to 3 Mediums

  • Medium reconfigure: reconfigure med1 & med2 for different type of chemical
  • Adding new medium: provide & install new CHC3 (include process tank, PS&PE 20 pump etc)
  • inline heating system upgrade: change out and add inline heater, heating range 35-60C, +/- 2C (45-60C); 150 process wafers per medium marathon
  • installation & Process qualify onsite

April 4, 2025

SP Series HEX Indirect Heating System to Inline Heater System!

Major upgrade from the traditional SP Series HEX Indirect Heating System to the advanced Inline Heater System—delivering unmatched efficiency, sustainability, and cost savings!

  • ✅ Massive Energy Savings – 60-80% reduction in electricity consumption, saving 66kW per day!
  • ✅ Significant Water Conservation – 600 liters of water saved daily
  • ✅ Eco-Friendly & Safe – No risk of chemical leaks into city water drainage, ensuring compliance and environmental safety.
  • ✅ Lower Maintenance & Reduced Waste – maximizing uptime and efficiency.

January 30, 2025

MAJOR SP304 Refurbishment Complete!

  • Platform Adaptability:  12-inch chuck systems to 8-inch chucks
  • FOUP to Cassette Conversion
  • Component Restoration: CDS, Boards, Robots etc
  • Standard to Bernoulli handling
  • Chemical system revitalization
  • Critical unit refurbish: HEX, Chuck drive & elevating etc

January 15, 2025

Chemical Analyzer for Chemical Bath Life Extension >50%

Revolutionizing Chemical Bath Management with Real-time Monitoring

We’re excited to introduce a significant advancement in our chemical bath management process: the implementation of a real-time chemical concentration analyzer. This innovative technology allows us to:

  • Monitor Chemical Concentration Continuously: .
  • Prevent Contamination and Errors:
  • Extend Chemical Bath Life: spiking water/chemical to maintain concentration, able to achieve close to double bath life extension