Major SP203 upgrade from 2 Mediums to 3 Mediums
Major System Upgrade for Enhanced Chemical Processing & Efficiency
Upgrade of SP203 system from 2 Mediums to 3 Mediums with reconfigured chemistry, new inline heating, and expanded capabilities for advanced wafer processing.
Medium Reconfiguration
🔹 Med1 Conversion
-
- From: Poly Tech
- To: Sub Etch
- Operating Temp: 29°C
🔹 Med2 Conversion
-
- From: HF 50%
- To: SF Etch
- Operating Temp: 25°C
Adding New Medium (CHC3 for HF 50%)
New CHC3 Setup (Assembly & testing @Singapore)
New medium CDS with following:
- Standard Process Tank
- PS20 Process Pump & PE20 Return Pump
- Standard Chemistry Filter Housing
- Med3 Flow Plan Integration in Main Unit
- New Consumables for main unit:
- Suckback Valves, Chamber Seals, O-Rings
- New Consumables for main unit:
- Pre-Shipment Functional Testing
Inline Heating System Upgrade for All 3 Mediums
Upgrade Kit Installation on SP203 Tool
- Replace inline heaters for Med1 & Med2
- Add new inline heater for CHC3 (Med3)
- Heating Range: 35–60°C
- Temperature Tolerance:
- 35–45°C: ±1.0°C
- 45–60°C: ±2.0°C
- function test: 150 process wafers per medium marathon
Onsite Installation & Process Qualification
- Onsite installation & system validation
- Full process qualification for stability & performance